The sequence of blast furnace blow in process is
Turbo blowers for blast-furnace blowing have now been in use for some years, and a review of the experience gained and the present state of progress may be interesting. The first blast-furnace blowing engine of this type to be installed in America was built by the General Electric Co. This machine was put into operation March 8, A duplicate unit is situated at the furnace of the Northern Iron Co.
More than 1. Blast furnace economics are such that larger units have lower unit production costs, hence there has been a trend to bigger and bigger furnaces. Modern blast furnaces produce more than 10, tonnes per day. For general information about merchant pig iron, please visit the pig iron page. The process is continuous with raw materials being regularly charged to the top of the furnace and molten iron and slag being tapped from the bottom of the furnace at regular intervals. Molten iron and slag collect in the furnace hearth. Being less dense, the slag floats on top of the iron.
The sequence of blast furnace blow in process is
The modern world uses shocking amounts of steel. In the US, we make roughly pounds of steel per person per year. At the peak of US steelmaking in the late s, it was closer to pounds per person, which is roughly how much China makes now. Modern steel is produced by two different methods. The first uses an electric arc furnace to melt recycled steel scrap. The second method is to make new steel out of iron ore. While new steel can also be made in an electric arc furnace via the direct reduction route, most new steel starts life in a blast furnace. That pig iron then goes through a refining process today a basic oxygen furnace, historically other methods such as open hearth furnaces or Bessemer converters which reduces the carbon content and turns it into steel. But this is a relatively modern development. The electric arc furnace is a comparatively modern invention. For the first half of the 20th century, the electric arc furnace was largely used to make relatively small amounts of high-quality tool steels, replacing the expensive crucible process.
Furthermore, on the basis of the thermodynamic and kinetic calculations of the graphite precipitation process, a precipitation potential index related to the formation of the graphite-rich protective layer was proposed to characterize the formation ability of this layer. The locating bearing for the entire system of turbine and compressor is at the turbine-end, and is so constructed that the axial position of the shaft with its turbine wheels and air impellers may be changed while the unit is in operation.
A blast furnace, after it is blown in and the production of hot metal starts, runs for a large number of years before it is put down for relining. This continuous run of the blast furnace is known as campaign life. In modern blast furnaces a campaign life of 15 years to 20 years is expected. The various types of shut downs of a blast furnace are described below. Fig 1. Fig 1 Important methods of shutting down a blast furnace. Very often while running of the blast furnace, a situation can arise when the full productive capacity of the furnace is not required for a period of time.
In the blast furnace, the iron ore reacts with the carbon contained in the coke to form grey or white pig iron. The iron in the processed ores must be dissolved out by chemical processes. This requires an element that binds oxygen more strongly than iron. This is exactly what carbon can do as a reducing agent. The carbon is fed to the blast furnace in the form of coke pyrolyzed coal from the coking plant. At sufficiently high temperatures, the carbon can participate directly in the reduction of the iron direct reduction. At lower temperatures, the reduction takes place indirectly with the help of the carbon monoxide gas formed during combustion indirect reduction. In both cases the iron oxide is reduced to iron. The use of carbon as a reducing agent is not only due to its high availability but as a gaseous substance carbon monoxide has the advantage that it can penetrate the porous ores well and react with the iron oxides.
The sequence of blast furnace blow in process is
The process of starting a blast furnace after its construction or after its relining is called blowing-in. The blowing-in process is carried out in several steps Fig 1 which consist of i drying out the lining, ii filling of the blast furnace with a specially arranged high coke blow-in furnace charge, iii igniting of the coke or lighting of the blast furnace, and iv gradually increasing the hot blast wind rate with frequent castings to ensure the raising of temperature of the blast furnace hearth. During the period of blow-in, the burden ratio ratio of the ore to coke is adjusted according to a predetermined schedule until the normal operation of the blast furnace is achieved and the blast furnace starts producing the normal quality of the hot metal. Fig 1 Steps in the blowing-in process of a blast furnace. Newly constructed or relined blast furnace is to be carefully dried before the coke is ignited. It is because the large amount of water contained in the slurry used for refractory brick laying and the water absorbed by the refractory brick work is to be driven off as much as possible for avoiding extreme thermal shock. There is sufficient data available that blowing-in of a blast furnace can cause damage to the refractory lining even when it has been properly dried. Furthermore, if the water from these sources is not removed from the blast furnace before it is put into operation, it absorbs heat more than that provided for the blow-in charge and hence prevents the hearth from reaching the desired temperature. In such cases, hot metal and liquid slag entering the hearth can freeze there and in such case it becomes impossible to remove them from the blast furnace. There are several methods which can be used to dry a blast furnace and the hot blast stoves associated with the blast furnace.
How to remove cycling pedals
The circulating flow of molten iron is an important reason that results in the erosion of blast furnace hearth. In studying a charging program and its resulting burden distribution, the mixed layers of coke and pellets were found to show lower voidage than the individual burden layers. More than once a number of holes were to be drilled and lanced before the salamander was hit for starting the tapping. It increased the temperature of the furnace, which in some cases allowed coal to be used instead of coke as a furnace fuel. The paper describes the central system. This technique is used for emergency situations or short periods only. If the pressure tends to increase, due to the furnace, the turbo blower must speed up or it will churn part of the air. For all repairs, including packings of all sorts, all pipe fittings, etc. Zinc and alkali attack. Whenever Mr. Other tuyere and cooler openings are blocked off and draft is regulated by adjusting the bleeders of the blast furnace. The exhaust gasses of a blast furnace are generally cleaned in the dust collector — such as an inertial separator, a baghouse , or an electrostatic precipitator. In , at Coalbrookdale in Shropshire, England, Abraham Darby began to fuel a blast furnace with coke instead of charcoal. Additionally, the charging pattern selection is important as it affects the burden trajectory and stock profile.
The objective of the blast furnace BF is to produce hot metal. The blast furnace is a tall, vertical shaft furnace which uses coke to reduce iron ores.
Richard H. Besides, noise transmission loss of the control and rest rooms were Due to their source, the availability of such materials is not always consistent, but their total production should be consumed in the sintering process, to both save money and recycle wastes. Hot air blown into the furnace burns the coke, which serves as source of heat and as an oxygen reducing agent to produce metallic iron. In the present paper tap hole clay properties in industrial use was tested and studied. Coke is made by destructive distillation of a blend of selected Bituminous coals called Coking coal or Metallurgical coal in special high temperature ovens in the absence of oxygen until a greater part of the volatile matter is driven off. A moving bed design is being developed. These stoves were constructed of iron shells lined with refractory and contained multiple passageways of refractory for the blast throughout. On a trip which I recently made through England I found that one of the foremost engineering firms of Great Britain had built a number of turbo blowers for blast furnaces, but had built only a disappointingly small number of turbo compressors for mining purposes, whereas that same firm was a very extensive builder of reciprocating compressors for mines. Whereas the iron from the bloomery could be used directly as wrought iron a nearly-zero carbon iron mixed with slag , the high-carbon blast furnace iron had to go through a second, involved conversion in a finery furnace to get wrought iron. Fig 1. On account of these discrepancies between rated and actual operating conditions, the first turbo blowers installed were found to be too large for the work.
0 thoughts on “The sequence of blast furnace blow in process is”