Bomba worthington 6 ln 18
These instructions must be read prior to installing, operating, using and maintaining this equipment. Page 2 of 36 flowserve. Additional sources
These instructions must be read prior to installing, operating, using and maintaining this equipment. Additional sources Replacement parts see 6. Flowserves products are designed, developed and manufactured with state-of-the-art technologies in modern facilities. The unit is produced with great care and commitment to continuous quality control, utilising sophisticated quality techniques, and safety requirements. Flowserve is committed to continuous quality improvement and being at service for any further information about the product in its installation and operation or about its support products, repair and diagnostic services. These instructions are intended to facilitate familiarization with the product and its permitted use.
Bomba worthington 6 ln 18
.
Check the flange connections and eliminate strains using elastic couplings or a method permitted. Inspection and re-treatment of metallic an unacceptable level the seal will need replacement. When releasing such guards, points To vacuum pump the fasteners must be unscrewed in an appropriate way to ensure that the fasteners remain captive.
.
When you see the email, be sure the click on the link to verify your email address. Used Worthington 5. Used gear pump, 3" suction and discharge, CF8M material, rpm, psi. Power Zone is a leading global supplier of new, used and reconditioned pumps for sale. Our inventory of pumps includes multi-stage centrifugal pumps, positive displacement pumps, reciprocating pumps, single stage centrifugal pumps and screw pumps in a variety of design standards including API Centrifugal Pumps, API Reciprocating Pumps and API Rotary Pumps. Industrial pumps perform a critical role in a wide array of industries. Power Zone provides a robust selection of heavy-duty, high-performance pumps engineered to deliver exceptional durability and reliability under the most extreme operating conditions.
Bomba worthington 6 ln 18
Academic year: Share "Manual bombas Worthington. Ver texto completo ahora. Fuerzas y momentos 4. Estas instrucciones deben guardarse siempre cerca del lugar donde funciona el producto o al lado del producto. El funcionamiento del producto de acuerdo con estas instrucciones es importante para asegurar su fiabilidad en servicio y para evitar riesgos. El hecho de escoger, instalar o usar inadecuadamente las piezas y accesorios Flowserve autorizadas se. Este producto ha sido escogido por satisfacer las especificaciones indicadas en su pedido de compra. El acuse de recibo de estas condiciones ha sido enviado separadamente al comprador. Se debe guardar una copia de las especificaciones junto con estas instrucciones.
5 mexican students killed leaked
Refer to the general arrangement drawing for the pump set. In addition it is essential to values in the table that follows. The temperature rise at the seals and bearings and due to the minimum permitted flow rate is taken into account in the temperatures stated. Consult Flowserve for preservative actions when a 2. If the seal requires an auxiliary quench then a connection must be made to a suitable source of liquid flow, low pressure steam or static pressure from a header tank. Ensure all vent connections are closed before starting. Check supply and fuses. If not supplied, guarding shall be fitted as necessary Vertical pumps — LV and UV to meet the requirements of ISO and EN Adding or removing shims between the motor stool and or any applicable local safety regulations. Jump to Page. Any shortage and or damage must be reported immediately to Flowserve and received in writing within one month of receipt of the equipment. The lubricating oil should be a high quality oil having oxidisation and foam inhibitors, or synthetic oil. Grease lubricated bearing operating normally. Any slight 5.
.
Operation at high capacity. If required, copies of other certificates sent separately to the Purchaser should be obtained from the Purchaser for retention with these User Instructions. When the contract requirement specifies these to be incorporated into User Instructions these are included here. Inspection and re-treatment of metallic surfaces if necessary with preservative is recommended at 6 monthly intervals. After adding pipework connections and rechecking the It should be noted that the motor has a spigot coupling alignment, the baseplate should then be rabbet fit into the motor stool and it is therefore not grouted in accordance with good engineering practice. It should NOT be distorted or pulled down onto the surface of the foundation, but should be supported to maintain the original alignment. On completion of work all guards and safety devices must be re-installed and made operative again. Check setting of baseplate: tighten, adjust, grout base as required. The bearing temperature may be allowed to rise to 55 C F above ambient but should not exceed 95 C F. Additional requirement for metallic pumps on non-metallic baseplates 1.
At me a similar situation. Is ready to help.
It is interesting. Prompt, where to me to learn more about it?
I apologise, but, in my opinion, you commit an error. Write to me in PM, we will talk.